Home - News - Details

Skills Of Structured Cabling Part 1

Structured wiring involves copper cable system, shielded cable system and optical fiber system, and the interior is complicated. If planning is not done in advance, certain problems will be brought about in the implementation. The content of this article will facilitate you to prepare and respond to the plan in time during the integrated wiring period.

Cooperate with other installation engineering universities

The structured wiring system must be designed in advance, and cooperate well with the installation projects such as civil engineering, fire protection, air conditioning, lighting, etc., so as to avoid unnecessary construction conflicts.

Different installation parts are treated separately

When conditions permit, the weak current should go through its own weak current well to reduce the chance of being affected by electromagnetic interference. The floor wiring room and the main engine room should be arranged as large as possible for development and maintenance needs. For the network, the laying of the physical layer is crucial because it is the foundation.

Master the margin of wiring nodes

Deploy as many points as possible, use a double-hole panel (one for voice, one for data), which works well with electricity, and distributes power points near the information points. Since the integrated wiring is generally a one-time project, it is relatively difficult to change the wiring after the wiring is completed, and the number of communication equipment is increasing with the development, so it is safer to arrange more.

Special treatment for private networks

Don't make the structured wiring too ideal, and don't integrate some more specialized networks into the structured wiring. Structured wiring is enough to integrate the telephone network, computer network, and building automation network.

COBTEL PATCH CORD

COBTEL PATCH CABLE

Send Inquiry

You Might Also Like